Case study 40 – 6 inch well flowline

Composite repair of a 6 inch well flow line carried out by Engineered Composite Solutions.

 

Integrity issue

A 6 inch well flowline was suffering from internal corrosion resulting in a small through wall defect close to a flange, which forced the client to shutdown the installation, It was proposed to use a FutureWrap composite repair to reinstate the pipework strength and provide a long term seal.

 

Design 

The design of the FutureWrap repair was according to ISO 24817. The design approach was to strengthen and locally seal the leak. The assumed defect size was circular of diameter 25 mm. The design parameters were: internal pressure 50 bar, temperature 900C, design lifetime 2 years. The repair design resulted in a thickness of 12.2 mm (15 layers) of FutureWrap Glass/LT composite repair with an axial length of 250 mm.

 

Installation

The installation steps are shown in the photographs from surface preparation through to final curing. Due to the geometry, a limited landing area was required, this was factored into the design. This was successfully executed by ECS technicians, using ECS specialist filler putties, to plug the pin hole and then encapsulate the flange within the FutureWrap repair, which consisted of 15 layers of the FutureWrap Glass/LT repair. Full QA/QC measurements were made to demonstrate that the FutureWrap repair was applied in accordance with ISO 24817.

 

Summary

Due to the offshore installation being shut down, FutureWrap materials and ECS technicians mobilised within 24 hrs.  The 6 inch well flowline was suffering internal corrosion was repaired using a FutureWrap Glass/LT composite repair with a design life of 2 years.

 

Download this case study

You can download this case study by clicking here.

 

Initial condition of pipework

Initial condition of pipework

After surface preparation

After surface preparation

After profiling - ECS

After profiling

Final cured repair

Final cured repair

Engineered Composite Solutions
Abz Business Park, Cirrus Building
6 International Avenue, Dyce Drive
Aberdeen AB21 0BH
t: +44 (0)1224 920 909 | e: sales@ecs-world.co.uk

© Copyright 2020 - all rights reserved. Cookie Policy | Privacy Policy

Engineered Composite Solutions Limited, Company No: ISO 9001 ISO45001 & ISO14001.

CONTACT US